Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1988
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Feb 25, 2024     Wing wires and aileron cables - (3 hours)       Category: Interior Finish
Routed and bundled wires, fuel lines and flap control teleflex cables at wing roots to interior. Secured flap teleflex cable to adel clamp on door post. Routed and connected L and R aileron cables thru cockpit pulleys to check for interference with wing root wires and lines. Pinned aileron bellcranks to check centering of control sticks.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.